Implementation of condition monitoring operations in the Arfa iron and steel company and steel factory since 2012 so far, which includes the following steps:
– Documenting and detailed study of the documents and drawings related to the equipment
– Determine sensitivity and specificityvibrating allowedrange of equipment according to related standards
– Implementation of the measured data program monthly and in case of emergency and interpret data
– Provide reports based on data collection and documented events and equipments problems
– Oil analysis implementation
– Perform of modal analysis project on the process compressor